ZUG, Switzerland--(BUSINESS WIRE)--Feb. 28, 2012-- Foster Wheeler AG (Nasdaq: FWLT) announced today that a subsidiary of its Global Engineering and Construction Group has been awarded a contract by a subsidiary of JSC LUKOIL for the supply of a waste heat boiler for LUKOIL Nizhegorodnefteorgsyntez Refinery, Nizhny Novgorod region, Russia. The value of Foster Wheeler’s contract was not disclosed and was included in the company’s fourth-quarter 2011 bookings.
The waste heat boiler will be installed downstream of a fluid catalytic cracking unit, enabling the production of gasoline that is intended to meet European Union Euro-5 standards. Foster Wheeler has supplied a similar unit to the refinery, which unit has been in operation since 2010 to Lukoil’s full satisfaction. Foster Wheeler’s scope of work is scheduled to be completed by March 2013.
Nike Air Force 1
Daelim Industrial-MHI-Marubeni Consortium concluded a contract to supply core facilities, gas turbines and steam turbines to Ulsan #4 combined thermal power plant with Korea East-West Power at Grand Intercontinental Hotel on February 14. This project values at KRW510 billion, of which Daelim accounts for KRW236.8 billion excluding surtax.
Technip’s wholly owned subsidiary Global Offshore Pty Ltd. has been awarded a pipeline installation contract by Woodside Energy Limited for the Greater Western Flank Phase 1 Project located 130 kilometers North West of Karratha in Western Australia.
SAN RAMON, Calif., February 15, 2012 – Chevron Corp. (NYSE: CVX) today reports that its affiliate Tengizchevroil LLP (TCO) expects to enter front-end engineering and design (FEED) in 2012 for an expansion project to increase total daily production between 250,000 and 300,000 barrels.
Houston, Texas — February 14, 2012 — KBR (NYSE: KBR) today announced it was awarded a contract by TAIF Group to provide licensing and engineering services for the Veba Combi Cracker (VCC) to be implemented at the Nizhnikamsk refinery in the Republic of Tatarstan, Russia.