Yokogawa Electric Corporation announces that its affiliate, Yokogawa Kontrol (Malaysia) Sdn. Bhd., has received an order from the CTCI Consortium*1, to supply control systems and field devices for the Kimanis combined cycle power plant*2, which is being built for Kimanis Power Sdn. Bhd. in the Malaysian state of Sabah, in the northeast part of Borneo island.
The Kimanis combined cycle power plant will have a total output of 300 MW (three 100 MW units). The first 100 MW unit, now under construction, is scheduled to start operation in December 2013.
This order is for a comprehensive range of control and instrumentation including the CENTUMĀ® VP integrated production control systems for the power plant's boilers and its boiler and turbine auxiliary facilities; the ProSafeĀ®-RS safety instrumented system for safely shutting down the plant if any abnormal conditions occur; exhaust gas analyzers; and differential pressure/pressure transmitters. Yokogawa Kontrol (Malaysia) Sdn. Bhd. will be responsible for project execution, including engineering, installation, and commissioning services.
Air Presto Flyknit Ultra